Dau Giay – Phan Thiet and Phan Thiet-Vinh Hao expressways required to be put into use by April 30th at the latest

16/03/2023, 10:01

BTO- Minister of Transport Nguyen Van Thang requested to complete the Phan Thiet-Dau Giay and Phan Thiet – Vinh Hao expressways before April 30, 2023, during his visit to Binh Thuan province yesterday.

As reported by the expressway contractor, the project of the Phan Thiet – Dau Giay expression section has so far completed over 85 percent, basically meeting the requirement. Meanwhile, the Phan Thiet – Vinh Hao section has attained over 75 percent of the total constructional volume. The constructions are facing the biggest difficulty of shortage of embarkment land for civil bridges and roads.

Although such shortcomings, the contractor commits to finishing the main routes of the two expressway projects and putting them into operation before April 30th, 2023 under the Direction of the Prime Minister and the Ministry of Transport.

Acknowledged the efforts of the contractor and local authorities, the Minister of Transport affirmed not to postpone the completion time of the two expressway projects of Giau Day – Phan Thiet and Phan Thiet – Vinh Hao, determining to put them into operation by April 30th at the latest.

The Phan Thiet-Dau Giay expressway section under the Eastern North – South Expressway Construction Investment Project for the 2017 – 2020 period, which is 99 kilometers long and 32 meters wide, connects the provinces of Dong Nai and Binh Thuan. Whereas, the Vinh HaoPhan Thiet Expressway has the total length of 100.82km, passes through 4 districts in Binh Thuan province.

TRANSLATED BY MT

According to Bao Binh Thuan
Copy Link
Related articles
Delegation of the Ministry of National Defense inspects Project of Phan Thiet Military Airport
BTO -A delegation of the Ministry of Defense led by Senior Lieutenant General Nguyen Tan Cuong, member of the Central Committee of the Party, Standing member of the Central Military Commission, Chief of the General Staff of the Vietnam People's Army - Deputy Minister of National Defense arrived in Binh Thuan province on March 14 morning.

(0) Comments
Focus
Exploring the wavy pass in the old jungle
Dai Ninh Pass is not the highest area in the Phan Son and Phan Lam forests, but this is the peak of the National Highway 28B connecting the two provinces of Binh Thuan and Lam Dong. The starting point is Luong Son Town, Bac Binh district, and the final point is adjacent to Highway 20 in Ninh Gia commune, Duc Trong district (Lam Dong), with a length of nearly 70 km.
Do not miss
POWERED BY ONECMS - A PRODUCT OF NEKO
Dau Giay – Phan Thiet and Phan Thiet-Vinh Hao expressways required to be put into use by April 30th at the latest